Showing posts with label HydroElectric Power. Show all posts
Showing posts with label HydroElectric Power. Show all posts

Tuesday, November 20, 2007

Verdant Submits New Turbine Designs for East River Power Project

The Daily News posted an article today, November 20, 2007, indicating that Verdant believes its new turbine design will finally beat the problem of the tidal currents causing damage to the blades and the turbine itself.

Verdant had originally submerged six turbines into the East Channel of the East River behind Gristedes and Motorgate. Verdant "...expects to plant two reinforced turbines for analysis as soon as February. "